Windows

Some progress since last update.  At the end of the year someone came along and drilled a couple of big holes in the land to investigate the ground.  This was to determine the composition and water content at various depths.

Following that the composition of both concrete & steel within the base plate has now been defined.

We also vistted the Architect once more to decide on the size of some windows (we wanted larrger of course) and in which direction they should open.  In germany all windows actually open inwards, but we had to choose if they went left or right etc.

He is now completing the more detailed drawings with a view to starting the materials and labour planning ASAP.

On Feb 11th we will travel to the head office of the building company to decide on all the fixtures and fittings we want, that should be interesting.

Advertisements

About JoeD
33yr old design engineer. Into Guns, Blood, Murder etc.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: